Kelowna Trails
Ryan Mckenna
It was a life changing moment that night at Baxter's Bar&Grill. It was 1999 and the floor was packed with mountain bikers eager to see the premier of Kranked 2. That film changed the way I wanted to ride bikes. The dawn of the freeride era was here and it was time to build trails. I started building at Gillard alongside the original builders in 2000. In 2003 our beloved trails were lost to a wildfire and I spent the following years reopening trails with hopes of bringing the network back to the popularity we once enjoyed. Soon after, I joined the first board of directors for MTBCO. As family and career became priority, I had to step away from trail building but always found time to ride my bike. Now 2020, I have jumped fists first back into the seat with MTBCO. My main role is working with Rec Site & Trails BC to preserve Gillard as the freeride destination it is known for, bringing the trails up to current standards and planning for a sustainable future. I would like to thank the past MTBCO directors for all the leg work done to get us here. These are exciting times and I'm looking forward to the future of mountain bike trails in the Central Okanagan.